Executive Summary

Shanghai LNG Company Limited, Shanghai, China
Shanghai LNG Company Limited,
Shanghai, China

China is rapidly developing into a major global economic power. To succeed in its drive to be the center of manufacturing for just about everything, China has an ever growing need for energy. One of the big challenges is securing sufficient gas supplies for the next 25-30 years. Like the country as a whole, Shanghai is undergoing a transformation into a major global economic center.

In January 2007 it was announced that CNOOC Gas and Power Limited, a subsidiary of China National Offshore Oil Corporation, had signed an agreement with Shenergy Group Limited for the development of the Shanghai LNG terminal by Shanghai LNG Company Limited (SHLNG).

The LNG is transported from Malaysia to Shanghai, the economic hub of east China. This is the third LNG terminal in China, with the others being in Guangdong and Fujian. Its current gas production capacity is 3 million tons per year, and a second construction phase starting in 2011 will double that.

The Shanghai LNG terminal is comprised of an LNG dock, three 160,500 m3 receiving tanks, regasification facilities, and a 40 km subsea gas trunk line to Shanghai.

For this project, Yokogawa China successfully installed and commissioned Yokogawa's CENTUM CS 3000 distributed control system (DCS), ProSafe-RS safety instrumented system (SIS), STARDOM network-based control system, OmegaLand operator training system (OTS), Exaquantum PIMS, and PRM asset management system as well as systems from other vendors.

Central control room
Central control room

The Challenges and the Solutions

Safety
Safety is an absolute requirement for this LNG terminal. The ProSafe-RS SIS is fully integrated with the CENTUM CS 3000 DCS, providing operators a unified operating environment in which they can monitor all DCS and SIS loops from the same human machine interface (HMI).

The layout of the central control room is designed with safety in mind. The mimic panel consoles for the fire and gas system and the emergency shutdown system follow the same design. A large screen displays graphics of plant facilities as well as video from CCTV cameras, so operators can easily spot problems and take quick action. All systems throughout the terminal are integrated with the CS 3000 DCS, allowing the Exaquantum PIMS to gather and process data from nearly 1,500 processes and display this in 30 different management level screens that provide information on plant performance, gas demand scheduling, gas production, gas specification, and nomination & allocation.

For added safety, Yokogawa installed its OmegaLand OTS. This simulator is used by both new and veteran operators to acquire and brush up on essential plant operation skills.

Steady gas supply
Shanghai relies on this LNG terminal for 40% of its natural gas, with the remainder coming from the West-East Gas Pipeline and a coal gasification plant.The CS 3000 DCS is the terminal's main control system and its field control stations (FCS) are highly reliable, with an availability of more than 99.99999% (seven 9s). The pipeline delivering gas to Shanghai is accurately monitored and controlled using Yokogawa's STARDOM network-based control system and the FAST/TOOLS SCADA monitoring package. The terminal operates reliably around the clock, 365 days a year.

Maximum automation
A room with engineering workstations is located right next to the central control room to facilitate the efforts of SHLNG's engineers to automate the terminal's control loops.Currently more than 90% of the control loops have been automated, bringing tremendous benefits. SHLNG is now considering certain procedural changes that will yield additional improvements in this area, and is using the OmegaLand simulator to optimize each loop's control strategy.

Effective use of asset management system (PRM)
Before plant start-up, each loop was checked to make sure that wiring had been done correctly, signals were being correctly transmitted, field devices were healthy, and valves were responding accurately to controller output signals. By helping to accurately check all these functions, PRM made it possible to complete the plant start-up ahead of schedule. And by monitoring the status of all field devices and issuing an alarm to maintenance engineers when preset conditions are reached, PRM makes possible a proactive maintenance approach that significantly reduces total cost of ownership.

Customer Satisfaction

Li Wen, Director of SHLNG's Facility Equipment Department, said, "We completed the first phase of this project and are supplying gas to Shanghai every day without any problems. We supply nearly 40% of the gas used by Shanghai. It follows that this role of providing a stable gas supply is a very important one. We very much appreciate Yokogawa's highly reliable systems and products. We will continue to improve our operations and will work to make more effective use of the OmegaLand OTS, PRM, and Exaquantum. We plan on working with Yokogawa for a long time to come."

Engineering room (DCS/ESD/FGS displays)

Engineering room (DCS/ESD/FGS displays)

Rack room (CENTUM FCS cabinets)

Rack room (CENTUM FCS cabinets)

ProSafe-RS SIS

ProSafe-RS SIS

<Project Information>

DCS: CENTUM CS 3000 (I/O: 1,600 points)
ESD: ProSafe-RS (I/O: 700 points)
Pipeline SCADA: STARDOM (I/O: 600 points)
OTS: Exatif & OmegaLand
PIMS Exaquantum (1,500 points of data on 30 pages)
Asset management system: PRM
Fire & gas system: GE-GMR (I/O: 1,200 points)
Fire & gas detector: CCTV flame, gas detector, beacon, MAC, etc/
Large screen: Planar

業種

  • ガス・LNG

    メタンを主成分とする天然ガスは他の化石燃料に比べ、CO2の排出量が少ないため、温暖化効果ガスの発生が少なく、また世界中に産出地があり安定した調達ができる事から、重要な1次エネルギーを担っております。
    LNG (液化天然ガス)を主体としたガス事業は、 社会を支える重要基盤として安定供給を第一の使命とし「安全・安心」を確保した操業が常に求められています。多くのガス事業者様は、安定供給を前提にしながら需要増・供給域拡充に対する設備増強計画や事業における燃料調達戦略・ CO2削減、LNG基地運用の最適化・効率化を目指すなど様々な課題に取り組まれています。
    YOKOGAWA は、これまでLNGをコアとしたガス工場やガス広域導管ネットワーク設備に「安全・安心」をキーとした様々なソリューションを提供してきました。
    これからも最新の最適化・管理・制御・監視・支援システムや現場機器・分析計や計測器、保守サービスなどの最適ソリューション・製品・保守を通じて、お客様のビジネスパートナーとして総合エネルギー事業の発展に貢献します。

    さらに見る

関連製品&ソリューション

  • プラント情報管理システム Exaquantum

    Exaquantum (エグザカンタム)は、プラント操業に携わるさまざまな部門のお客様に、必要な情報を最適な形にして提供します。製造業を知り尽くしたYOKOGAWAだからこそ実現できたプラント情報管理システム(PIMS)です。

    さらに見る
  • 安全計装システム ProSafe-RS

    ProSafe-RSは国産初(2005年2月発売)の本格的なプロセス用統合型安全計装システムです。世界ではじめてシングル構成でSIL3に適用できる安全性を実現し、さらに冗長化構成により高稼働率も実現します。また、CENTUMとの融合により本格的な統合化が可能です。

    さらに見る
  • 自律型コントローラ FCJ

    FCJは、本体にI/Oインタフェースを内蔵した、オールインワンタイプのコントローラです。
    耐環境性に優れており、装置組み込みや分散配置のシステムを構築する場合に適しています。制御ネットワークの二重化にも対応しています。

    さらに見る
  • 自律型コントローラ FCN-RTU

    FCN-RTUは、堅牢かつ高信頼設計を採用した、低消費電力タイプの自律型コントローラです。
    また、CPUモジュールにI/Oインタフェースを内蔵しているため、コンパクトなシステム構成が可能です。I/Oモジュールの追加実装も可能なため、拡張性にも優れたコントローラです。

    さらに見る
  • 中小規模向け計装システム (STARDOM)

    中小規模向け計装システム STARDOMはコントローラやHMI等のオープンなコンポーネント群を、ネットワーク上で統合する計装システムです。柔軟性あるエンジニアリング環境により 高信頼の二重化システムからタッチオペレーションパネルを用いた現場での操作監視まで、各種PLC計装システムを実現します。

    さらに見る
  • 統合生産制御システム(DCS)

    独自のデジタル制御技術と経験、ノウハウの粋を集めた世界最初の分散形制御システム(DCS)である「CENTUM(センタム)」は、1975年に販売開始しました。発売以来、世界100カ国以上、累計30,000以上のシステムが採用されています。

    さらに見る

トップ